Project: Allies Refuge Country: Germany Location: Ramstein Air Base Duration: 2 months Capacity: 28,000 people Toilets: 1,300 Showers: 108 Service: Project planning, design and visualization with CAD Provision, operation of temporary field camps Facility management 54 employees supplied the camp 24/7 Water- Sewage - Fuel supply
▪ Toilet & Shower Containers ▪ Electricity, Water, Sewage, Diesel ▪ Lodging Containers ▪ Hand Wash Basins ▪Camp beds, sleeping bags, chairs, tables ▪ Drive-over ramps ▪ Waste disposal 360 cbm/day ▪ Sanitary facilities incl. UV filter systems ▪ Hotmobile for 750,000 ltr. water/day
▪ Gensets ▪ Power distributors ▪ Mobile fuel station ▪Fuel tanks and containers ▪ Water pads ▪ Diesel supply ▪ Water supply